This design, build and operate (DBO) project saw Irish Water engage Murphy to deliver new a major upgrade to the water collection and treatment infrastructure serving the catchment areas of Gorey and Courtown. This project included:
The key challenge which was met on this project was to ensure that we succeeded in delivering the upgrade works without any interruption in either available treatment capacity or performance