PROJECT OUTLINE

The contract with BBCLG for GNI started in 2012 and Involves the maintenance and upgrading of the Gas Transmission Network Stations throughout Ireland. To date Murphy has worked in over 100 of the Above Ground Installations (AGI’s) with projects including:

  • Pipe support remediation and replacement
  • Heat Exchanger overhaul
  • Waterbath overhaul
  • Boiler replacement
  • Security Fencing
  • ATEX upgrades
  • Filter assembly for Inline Intelligent Pigging operations
  • New AGI construction
  • Capacity upgrades to existing AGIs

Murphy provide a 24/7 emergency response service throughout ROI.

KEY CHALLENGES

All of the projects are within live gas stations which require strict control under GNI Permit to Work systems. This is further backed up by BBCLG and Murphy Ireland control systems. We have upskilled our workforce to allow the flexibility required to cover the geographical spread and different disciplines needed. The contracts can be for as few as 2 people to upwards of 30.

PROJECT DELIVERY AND INNOVATIONS

The Heat Exchanger Overhauls require the removal of a key piece of equipment from the stream for cleaning, inspection and pressure testing. Originally this was all carried out onsite within the confines of the AGI. This operation is now carried out within our purpose built testing facility in Newbridge. A shortened “pupped” trailer is used on our articulated 20t Hiab to load the Heat Exchanger for transportation to our yard. The main advantage is that the test is carried out in a safe environment and not within a live gas station.

Throughout the project Murphy have proactively participated in value engineering with the Client to ensure the most cost-effective solution was provided.

KEY FACTS

  • Brownsbarn AGI 2017 – Waterbath Heater replacement and modification to pipework and control systems, including decommissioning and demolition.
  • Craggs AGI 2018 – Upgrading existing station to supply new Listowel Feedermain to Kerry Foods
  • ATEX Remedials 2018 – modification of 24no. AGI’s to comply with new standards for Hazardous Zones Compliance.
  • Pipe Support Remediation – Phase 4 2017. Painting of pipe supports and interface with ground in 11 AGI’s throughout Ireland.
  • Heat Exchanger Overhauls 2017 – removal of heat exchanger to our yard in Newbridge for inspection and pressure testing before reinstalling.
  • Emergency Call-Out - Transmission. Retainer to supply specialist Mechanical and Civil crews for all damage to GNI Transmission Pipeline System.