{"id":1059,"date":"2024-09-03T12:47:09","date_gmt":"2024-09-03T11:47:09","guid":{"rendered":"https:\/\/www.murphygroup.com\/?post_type=project&#038;p=1059"},"modified":"2026-04-21T15:56:36","modified_gmt":"2026-04-21T14:56:36","slug":"south-tipperary-grouped-wastewater-treatment-scheme","status":"publish","type":"project","link":"https:\/\/www.murphygroup.com\/staging\/project\/south-tipperary-grouped-wastewater-treatment-scheme\/","title":{"rendered":"South Tipperary Grouped Wastewater Treatment Scheme"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Project Outline<\/h2>\n\n\n\n<p>Under this design, build and operate (DBO) project Murphy delivered new and upgraded infrastructure at portfolio of sites across South Tipperary. The project encompasses plants at twelve separate locations and comprised both new builds and upgrades to existing facilities.<\/p>\n\n\n\n<p>The newly constructed plants were:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Carrick-on-Suir (11,000 PE).<\/li>\n\n\n\n<li>Ballyporeen (1,000 PE).<\/li>\n\n\n\n<li>Ardfinnan (1,100 PE).<\/li>\n\n\n\n<li>Clogheen (1,000 PE).<\/li>\n\n\n\n<li>Ballyclerihan (2,000 PE).<\/li>\n<\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p>Existing plants which were refurbished and upgraded included:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Clonmel (80,000 PE).<\/li>\n\n\n\n<li>Cashel (9,000 PE).<\/li>\n\n\n\n<li>Cahir (5,000 PE).<\/li>\n\n\n\n<li>Tipperary (9,800 PE).<\/li>\n\n\n\n<li>Fethard (3,000 PE).<\/li>\n\n\n\n<li>Kilsheelan (1,000 PE).<\/li>\n\n\n\n<li>Killenaule (1,200 PE).<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"860\" height=\"573\" src=\"https:\/\/www.murphygroup.com\/staging\/wp-content\/uploads\/2024\/09\/SOUTHT1.webp\" alt=\"The inside of a wastewater treatment plant with large machines and green pipes lining the walls.\" class=\"wp-image-2396\" srcset=\"https:\/\/www.murphygroup.com\/staging\/wp-content\/uploads\/2024\/09\/SOUTHT1.webp 860w, https:\/\/www.murphygroup.com\/staging\/wp-content\/uploads\/2024\/09\/SOUTHT1-300x200.webp 300w, https:\/\/www.murphygroup.com\/staging\/wp-content\/uploads\/2024\/09\/SOUTHT1-768x512.webp 768w\" sizes=\"auto, (max-width: 860px) 100vw, 860px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Key Challenges<\/h2>\n\n\n\n<p>A key project driver shared by many of the plants is the continued protection of the Lower River Suir. Designated as a Natura 2000 site and a Special Area of Conservation, the Murphy operations teams continuously works to protect this water resource and area of outstanding natural beauty.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Project Delivery &amp; Innovations<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Murphy assumed operational responsibility for all existing facilities upon commencement of the design-build works in 2004 and have been responsible for their safe operation ever since.<\/li>\n\n\n\n<li>The project was delivered without any interruption to operational throughput or reduction in the performance.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Project Outline Under this design, build and operate (DBO) project Murphy delivered new and upgraded infrastructure at portfolio of sites across South Tipperary. The project encompasses plants at twelve separate locations and comprised both new builds and upgrades to existing facilities. The newly constructed plants were: Existing plants which were refurbished and upgraded included: Key [&hellip;]<\/p>\n","protected":false},"featured_media":2397,"template":"","meta":{"_acf_changed":true},"project-customer":[21],"class_list":["post-1059","project","type-project","status-publish","has-post-thumbnail","hentry","project-customer-irish-water"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>South Tipperary Grouped Wastewater Treatment Scheme - Murphy<\/title>\n<meta name=\"description\" content=\"Find out more information about Murphy&#039;s involvement in the ongoing South Tipperary wastewater project.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/project\\\/south-tipperary-grouped-wastewater-treatment-scheme\\\/\",\"url\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/project\\\/south-tipperary-grouped-wastewater-treatment-scheme\\\/\",\"name\":\"South Tipperary Grouped Wastewater Treatment Scheme - Murphy\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/project\\\/south-tipperary-grouped-wastewater-treatment-scheme\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/project\\\/south-tipperary-grouped-wastewater-treatment-scheme\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/SOUTHT2.webp\",\"datePublished\":\"2024-09-03T11:47:09+00:00\",\"dateModified\":\"2026-04-21T14:56:36+00:00\",\"description\":\"Find out more information about Murphy's involvement in the ongoing South Tipperary wastewater project.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/project\\\/south-tipperary-grouped-wastewater-treatment-scheme\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/project\\\/south-tipperary-grouped-wastewater-treatment-scheme\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/project\\\/south-tipperary-grouped-wastewater-treatment-scheme\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/SOUTHT2.webp\",\"contentUrl\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/SOUTHT2.webp\",\"width\":700,\"height\":450},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/project\\\/south-tipperary-grouped-wastewater-treatment-scheme\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"South Tipperary Grouped Wastewater Treatment Scheme\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/#website\",\"url\":\"https:\\\/\\\/www.murphygroup.com\\\/\",\"name\":\"Murphy\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.murphygroup.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/#organization\",\"name\":\"Murphy\",\"url\":\"https:\\\/\\\/www.murphygroup.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/j-murphy-and-sons-limited-vector-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/j-murphy-and-sons-limited-vector-logo.png\",\"width\":323,\"height\":112,\"caption\":\"Murphy\"},\"image\":{\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"South Tipperary Grouped Wastewater Treatment Scheme - Murphy","description":"Find out more information about Murphy's involvement in the ongoing South Tipperary wastewater project.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.murphygroup.com\/staging\/project\/south-tipperary-grouped-wastewater-treatment-scheme\/","url":"https:\/\/www.murphygroup.com\/staging\/project\/south-tipperary-grouped-wastewater-treatment-scheme\/","name":"South Tipperary Grouped Wastewater Treatment Scheme - Murphy","isPartOf":{"@id":"https:\/\/www.murphygroup.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.murphygroup.com\/staging\/project\/south-tipperary-grouped-wastewater-treatment-scheme\/#primaryimage"},"image":{"@id":"https:\/\/www.murphygroup.com\/staging\/project\/south-tipperary-grouped-wastewater-treatment-scheme\/#primaryimage"},"thumbnailUrl":"https:\/\/www.murphygroup.com\/staging\/wp-content\/uploads\/2024\/09\/SOUTHT2.webp","datePublished":"2024-09-03T11:47:09+00:00","dateModified":"2026-04-21T14:56:36+00:00","description":"Find out more information about Murphy's involvement in the ongoing South Tipperary wastewater project.","breadcrumb":{"@id":"https:\/\/www.murphygroup.com\/staging\/project\/south-tipperary-grouped-wastewater-treatment-scheme\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.murphygroup.com\/staging\/project\/south-tipperary-grouped-wastewater-treatment-scheme\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.murphygroup.com\/staging\/project\/south-tipperary-grouped-wastewater-treatment-scheme\/#primaryimage","url":"https:\/\/www.murphygroup.com\/staging\/wp-content\/uploads\/2024\/09\/SOUTHT2.webp","contentUrl":"https:\/\/www.murphygroup.com\/staging\/wp-content\/uploads\/2024\/09\/SOUTHT2.webp","width":700,"height":450},{"@type":"BreadcrumbList","@id":"https:\/\/www.murphygroup.com\/staging\/project\/south-tipperary-grouped-wastewater-treatment-scheme\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.murphygroup.com\/staging\/"},{"@type":"ListItem","position":2,"name":"South Tipperary Grouped Wastewater Treatment Scheme"}]},{"@type":"WebSite","@id":"https:\/\/www.murphygroup.com\/#website","url":"https:\/\/www.murphygroup.com\/","name":"Murphy","description":"","publisher":{"@id":"https:\/\/www.murphygroup.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.murphygroup.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.murphygroup.com\/#organization","name":"Murphy","url":"https:\/\/www.murphygroup.com\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.murphygroup.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.murphygroup.com\/staging\/wp-content\/uploads\/2024\/08\/j-murphy-and-sons-limited-vector-logo.png","contentUrl":"https:\/\/www.murphygroup.com\/staging\/wp-content\/uploads\/2024\/08\/j-murphy-and-sons-limited-vector-logo.png","width":323,"height":112,"caption":"Murphy"},"image":{"@id":"https:\/\/www.murphygroup.com\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.murphygroup.com\/staging\/wp-json\/wp\/v2\/project\/1059","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.murphygroup.com\/staging\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/www.murphygroup.com\/staging\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.murphygroup.com\/staging\/wp-json\/wp\/v2\/media\/2397"}],"wp:attachment":[{"href":"https:\/\/www.murphygroup.com\/staging\/wp-json\/wp\/v2\/media?parent=1059"}],"wp:term":[{"taxonomy":"project-customer","embeddable":true,"href":"https:\/\/www.murphygroup.com\/staging\/wp-json\/wp\/v2\/project-customer?post=1059"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}