{"id":783,"date":"2022-02-28T12:58:00","date_gmt":"2022-02-28T12:58:00","guid":{"rendered":"https:\/\/www.murphygroup.com\/?p=783"},"modified":"2026-03-04T11:13:20","modified_gmt":"2026-03-04T11:13:20","slug":"murphy-awarded-network-rail-cp6-anglia-framework","status":"publish","type":"post","link":"https:\/\/www.murphygroup.com\/staging\/murphy-awarded-network-rail-cp6-anglia-framework\/","title":{"rendered":"Murphy awarded Network Rail CP6 *Anglia Framework*"},"content":{"rendered":"\n<p><strong>Murphy has been awarded one of three multi-billion-pound contracts by Network Rail for the South of England, worth up to \u00a37bn for Control Period 6 (2019-2024).&nbsp;<\/strong><\/p>\n\n\n\n<p>The framework to deliver renewals and enhancements in Anglia, South East and Wessex has been awarded to\u202fMurphy (Anglia), BAM Nuttall Limited (South East) and Geoffrey Osborne Limited (Wessex) who will act as strategic delivery partners throughout CP6.&nbsp;<\/p>\n\n\n\n<p>The multi-discipline framework will deliver projects of varying value, including stations, buildings and civils, electrifications, power, signalling, telecommunications and track. This is initially in place for a five-year period but has the option of three one-year extensions if required.&nbsp;<\/p>\n\n\n\n<p>Cameron Burns, Commercial Director Southern region, said: \u201cOver the last few years we have made a shift towards working more collaboratively and closer to fewer key contractors, which has allowed us to deliver major improvements for passengers successfully and safely. Given that we are delivering in some of Britain\u2019s busiest stations and on some of the most used routes into the capital, our ability to upgrade the railway with minimal impact on passengers is increasingly important. We want to build on this success for CP6 and the relationships we have with our suppliers, and we look forward to working with them all going forward.\u201d&nbsp;<\/p>\n\n\n\n<p>John&nbsp;Dowsett, Managing Director for Infrastructure at Osborne, said: \u201cWinning this CP6 framework is highly significant for us \u2013 it sees us further strengthening our rail portfolio and continuing to work with Network Rail, who recognise and value the collaborative approach we bring.\u201d&nbsp;<\/p>\n\n\n\n<p>John Murphy, CEO of J Murphy and Sons said: \u201cWe are excited to be part of Network Rail\u2019s strategic partnership to deliver CP6.\u202f This award continues our long partnership with them in renewing and enhancing infrastructure throughout the UK and will give us the chance to work together and drive innovation and improvements. It was a real team effort across Murphy, and the framework will leverage our engineering and rail capabilities across our whole business. We are looking forward to getting started and delivering safely and efficiently to benefit rail passengers across the Anglia route.\u201d&nbsp;<\/p>\n\n\n\n<p>Huw Jones, BAM\u2019s Rail Director said: \u201cWe\u2019re proud of the contribution we\u2019ve made and are excited to be continuing our collaboration with Network Rail, and our supply chain, for the safe delivery of exceptional rail infrastructure. This confirmation of our continued involvement allows us to invest with confidence in developing skills, our innovation pipeline and technology. We look forward to playing our part, demonstrating BAM\u2019s commitment to creating sustainable solutions that enhance lives \u2013 including rail passengers and the communities where we work.\u201d&nbsp;<\/p>\n\n\n\n<p><strong>Notes to editors:&nbsp;<\/strong><\/p>\n\n\n\n<p>The multidiscipline framework is set up to deliver both renewals and enhancements. The estimated renewals spend on each contract is outlined below:&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Route&nbsp;<\/td><td>CP6 renewals estimated value&nbsp;<\/td><\/tr><tr><td>Anglia&nbsp;<\/td><td>\u00a3340m \u2013 \u00a3460m&nbsp;<\/td><\/tr><tr><td>Southeast&nbsp;<\/td><td>\u00a3640m \u2013 \u00a3860m&nbsp;<\/td><\/tr><tr><td>Wessex&nbsp;<\/td><td>\u00a3280m \u2013 \u00a3370m&nbsp;<\/td><\/tr><tr><td>Total&nbsp;<\/td><td>\u00a31.26bn \u2013 \u00a31.69bn&nbsp;<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>The estimated enhancements spend on each contract is outlined below:&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td>Route&nbsp;<\/td><td>CP6 Enhancements&nbsp;<\/td><\/tr><tr><td>Anglia&nbsp;<\/td><td>Up to \u00a3810m&nbsp;<\/td><\/tr><tr><td>Southeast&nbsp;<\/td><td>Up to \u00a31.06bn&nbsp;<\/td><\/tr><tr><td>Wessex&nbsp;<\/td><td>Up to \u00a3850m&nbsp;<\/td><\/tr><tr><td>Total&nbsp;<\/td><td>Up to \u00a32.72bn&nbsp;<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Network Rail\u2019s delivery arm for renewals and projects, Infrastructure Projects (IP) organises itself into four regional areas \u2013 Scotland North East, Central, Southern and Western and Wales, and national programmes for Signalling, Track and the pan regional Northern Programme.&nbsp;<\/li>\n\n\n\n<li>The tender and procurement process for CP6 was intentionally phased to help improve efficiency for both Network Rail and the supply chain.&nbsp;<\/li>\n\n\n\n<li>Southern is the second region to announce its contract awards. Last month,\u202f<a href=\"https:\/\/www.networkrailmediacentre.co.uk\/news\/network-rail-announces-first-contract-awards-for-multi-billion-pound-work-bank-in-cp6\">Scotland and North East awarded two lots<\/a>\u202fwithin their framework to Story Contracting and&nbsp;AmcoGiffen.&nbsp;<\/li>\n\n\n\n<li>The framework award is one of the most substantial of Network Rail\u2019s CP6 contracts to be let following the Office of Rail and Road\u2019s final determination, which confirmed \u00a335bn of funding for rail maintenance and renewals.&nbsp;<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Murphy has been awarded one of three multi-billion-pound contracts by Network Rail for the South of England, worth up to \u00a37bn for Control Period 6 (2019-2024).&nbsp; The framework to deliver renewals and enhancements in Anglia, South East and Wessex has been awarded to\u202fMurphy (Anglia), BAM Nuttall Limited (South East) and Geoffrey Osborne Limited (Wessex) who [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1942,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-783","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorised"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Network Rail CP6 Anglia Framework Awarded to Murphy<\/title>\n<meta name=\"description\" content=\"Murphy secures the Network Rail CP6 Anglia Framework, delivering critical rail infrastructure upgrades to improve transport connectivity across the region.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/murphy-awarded-network-rail-cp6-anglia-framework\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/murphy-awarded-network-rail-cp6-anglia-framework\\\/\"},\"author\":{\"name\":\"admin@hydra\",\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/#\\\/schema\\\/person\\\/1b00181dd34a4567634e572a0a2d34dd\"},\"headline\":\"Murphy awarded Network Rail CP6 *Anglia Framework*\",\"datePublished\":\"2022-02-28T12:58:00+00:00\",\"dateModified\":\"2026-03-04T11:13:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/murphy-awarded-network-rail-cp6-anglia-framework\\\/\"},\"wordCount\":671,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/murphy-awarded-network-rail-cp6-anglia-framework\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/resized-CP6-Award.webp\",\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/murphy-awarded-network-rail-cp6-anglia-framework\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/murphy-awarded-network-rail-cp6-anglia-framework\\\/\",\"url\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/murphy-awarded-network-rail-cp6-anglia-framework\\\/\",\"name\":\"Network Rail CP6 Anglia Framework Awarded to Murphy\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/murphy-awarded-network-rail-cp6-anglia-framework\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/murphy-awarded-network-rail-cp6-anglia-framework\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/resized-CP6-Award.webp\",\"datePublished\":\"2022-02-28T12:58:00+00:00\",\"dateModified\":\"2026-03-04T11:13:20+00:00\",\"description\":\"Murphy secures the Network Rail CP6 Anglia Framework, delivering critical rail infrastructure upgrades to improve transport connectivity across the region.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/murphy-awarded-network-rail-cp6-anglia-framework\\\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/murphy-awarded-network-rail-cp6-anglia-framework\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/murphy-awarded-network-rail-cp6-anglia-framework\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/resized-CP6-Award.webp\",\"contentUrl\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/resized-CP6-Award.webp\",\"width\":1000,\"height\":753,\"caption\":\"An aerial view of railway tracks under construction with a cityscape in the background.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/murphy-awarded-network-rail-cp6-anglia-framework\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Murphy awarded Network Rail CP6 *Anglia Framework*\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/#website\",\"url\":\"https:\\\/\\\/www.murphygroup.com\\\/\",\"name\":\"Murphy\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.murphygroup.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/#organization\",\"name\":\"Murphy\",\"url\":\"https:\\\/\\\/www.murphygroup.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/j-murphy-and-sons-limited-vector-logo.png\",\"contentUrl\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/wp-content\\\/uploads\\\/2024\\\/08\\\/j-murphy-and-sons-limited-vector-logo.png\",\"width\":323,\"height\":112,\"caption\":\"Murphy\"},\"image\":{\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.murphygroup.com\\\/#\\\/schema\\\/person\\\/1b00181dd34a4567634e572a0a2d34dd\",\"name\":\"admin@hydra\",\"sameAs\":[\"https:\\\/\\\/www.murphygroup.com\\\/staging\"],\"url\":\"https:\\\/\\\/www.murphygroup.com\\\/staging\\\/author\\\/adminhydra\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Network Rail CP6 Anglia Framework Awarded to Murphy","description":"Murphy secures the Network Rail CP6 Anglia Framework, delivering critical rail infrastructure upgrades to improve transport connectivity across the region.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.murphygroup.com\/staging\/murphy-awarded-network-rail-cp6-anglia-framework\/#article","isPartOf":{"@id":"https:\/\/www.murphygroup.com\/staging\/murphy-awarded-network-rail-cp6-anglia-framework\/"},"author":{"name":"admin@hydra","@id":"https:\/\/www.murphygroup.com\/#\/schema\/person\/1b00181dd34a4567634e572a0a2d34dd"},"headline":"Murphy awarded Network Rail CP6 *Anglia Framework*","datePublished":"2022-02-28T12:58:00+00:00","dateModified":"2026-03-04T11:13:20+00:00","mainEntityOfPage":{"@id":"https:\/\/www.murphygroup.com\/staging\/murphy-awarded-network-rail-cp6-anglia-framework\/"},"wordCount":671,"commentCount":0,"publisher":{"@id":"https:\/\/www.murphygroup.com\/#organization"},"image":{"@id":"https:\/\/www.murphygroup.com\/staging\/murphy-awarded-network-rail-cp6-anglia-framework\/#primaryimage"},"thumbnailUrl":"https:\/\/www.murphygroup.com\/staging\/wp-content\/uploads\/2024\/08\/resized-CP6-Award.webp","inLanguage":"en-GB","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.murphygroup.com\/staging\/murphy-awarded-network-rail-cp6-anglia-framework\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.murphygroup.com\/staging\/murphy-awarded-network-rail-cp6-anglia-framework\/","url":"https:\/\/www.murphygroup.com\/staging\/murphy-awarded-network-rail-cp6-anglia-framework\/","name":"Network Rail CP6 Anglia Framework Awarded to Murphy","isPartOf":{"@id":"https:\/\/www.murphygroup.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.murphygroup.com\/staging\/murphy-awarded-network-rail-cp6-anglia-framework\/#primaryimage"},"image":{"@id":"https:\/\/www.murphygroup.com\/staging\/murphy-awarded-network-rail-cp6-anglia-framework\/#primaryimage"},"thumbnailUrl":"https:\/\/www.murphygroup.com\/staging\/wp-content\/uploads\/2024\/08\/resized-CP6-Award.webp","datePublished":"2022-02-28T12:58:00+00:00","dateModified":"2026-03-04T11:13:20+00:00","description":"Murphy secures the Network Rail CP6 Anglia Framework, delivering critical rail infrastructure upgrades to improve transport connectivity across the region.","breadcrumb":{"@id":"https:\/\/www.murphygroup.com\/staging\/murphy-awarded-network-rail-cp6-anglia-framework\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.murphygroup.com\/staging\/murphy-awarded-network-rail-cp6-anglia-framework\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.murphygroup.com\/staging\/murphy-awarded-network-rail-cp6-anglia-framework\/#primaryimage","url":"https:\/\/www.murphygroup.com\/staging\/wp-content\/uploads\/2024\/08\/resized-CP6-Award.webp","contentUrl":"https:\/\/www.murphygroup.com\/staging\/wp-content\/uploads\/2024\/08\/resized-CP6-Award.webp","width":1000,"height":753,"caption":"An aerial view of railway tracks under construction with a cityscape in the background."},{"@type":"BreadcrumbList","@id":"https:\/\/www.murphygroup.com\/staging\/murphy-awarded-network-rail-cp6-anglia-framework\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.murphygroup.com\/staging\/"},{"@type":"ListItem","position":2,"name":"Murphy awarded Network Rail CP6 *Anglia Framework*"}]},{"@type":"WebSite","@id":"https:\/\/www.murphygroup.com\/#website","url":"https:\/\/www.murphygroup.com\/","name":"Murphy","description":"","publisher":{"@id":"https:\/\/www.murphygroup.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.murphygroup.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/www.murphygroup.com\/#organization","name":"Murphy","url":"https:\/\/www.murphygroup.com\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/www.murphygroup.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.murphygroup.com\/staging\/wp-content\/uploads\/2024\/08\/j-murphy-and-sons-limited-vector-logo.png","contentUrl":"https:\/\/www.murphygroup.com\/staging\/wp-content\/uploads\/2024\/08\/j-murphy-and-sons-limited-vector-logo.png","width":323,"height":112,"caption":"Murphy"},"image":{"@id":"https:\/\/www.murphygroup.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.murphygroup.com\/#\/schema\/person\/1b00181dd34a4567634e572a0a2d34dd","name":"admin@hydra","sameAs":["https:\/\/www.murphygroup.com\/staging"],"url":"https:\/\/www.murphygroup.com\/staging\/author\/adminhydra\/"}]}},"_links":{"self":[{"href":"https:\/\/www.murphygroup.com\/staging\/wp-json\/wp\/v2\/posts\/783","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.murphygroup.com\/staging\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.murphygroup.com\/staging\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.murphygroup.com\/staging\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.murphygroup.com\/staging\/wp-json\/wp\/v2\/comments?post=783"}],"version-history":[{"count":7,"href":"https:\/\/www.murphygroup.com\/staging\/wp-json\/wp\/v2\/posts\/783\/revisions"}],"predecessor-version":[{"id":2084,"href":"https:\/\/www.murphygroup.com\/staging\/wp-json\/wp\/v2\/posts\/783\/revisions\/2084"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.murphygroup.com\/staging\/wp-json\/wp\/v2\/media\/1942"}],"wp:attachment":[{"href":"https:\/\/www.murphygroup.com\/staging\/wp-json\/wp\/v2\/media?parent=783"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.murphygroup.com\/staging\/wp-json\/wp\/v2\/categories?post=783"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.murphygroup.com\/staging\/wp-json\/wp\/v2\/tags?post=783"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}